During the Bendigo Hospital Project we’ve seen:
- 134,000 tonnes of soil excavated
- 33,000 m3 of concrete poured
- 147,000 tonnes of excavated materials
- 627 tonnes of structural steel used
- Façade materials combine to cover 28,996 m2
- Installed 14,000 m2 of glazing to facade
- Installed roofing covers 9,201 m2
- 1152 precast walls installed
- 3158 doors installed
- 72,150 m2 vinyl Installed to floors, walls and skirting
- Total area of carpet is 10,169 m2
- 225,000 m2 of plasterboard installed
- Installed a 200-kW solar system which will generate 285,000 of kW-hours each year (approx)
- A maximum total of 790 workers onsite at the project’s peak period of Stage One activity
- Four tower cranes were onsite at the peak of the Stage One project
(m3 = cubic metres; m2 = square metres)