During the Bendigo Hospital Project we’ve seen:

  • 134,000 tonnes of soil excavated
  • 33,000 m3 of concrete poured
  • 147,000 tonnes of excavated materials
  • 627 tonnes of structural steel used
  • Façade materials combine to cover 28,996 m2
  • Installed 14,000 m2 of glazing to facade
  • Installed roofing covers 9,201 m2
  • 1152 precast walls installed
  • 3158 doors installed
  • 72,150 m2 vinyl Installed to floors, walls and skirting
  • Total area of carpet is 10,169 m2
  • 225,000 m2 of plasterboard installed
  • Installed a 200-kW solar system which will generate 285,000 of kW-hours each year (approx)
  • A maximum total of 790 workers onsite at the project’s peak period of Stage One activity
  • Four tower cranes were onsite at the peak of the Stage One project
    (m3 = cubic metres; m2 = square metres)